Commissioning An Emergency Door Release Button; Video Management; Preparing Documentation; Networking Scenarios - Huawei ECC800 User Manual

Data center controller
Hide thumbs Also See for ECC800:
Table of Contents

Advertisement

ECC800 Data Center Controller
User Manual (for ECC800-Pro)

6.4.4 Commissioning an Emergency Door Release Button

Procedure
Step 1 Check the function of an emergency door release button.
Table 6-20 Function check
Check Method
When the room door is
properly closed,
short-circuit the wiring
terminals NC and COM or
NO and COM on the
emergency door release
button.
----End

6.5 Video Management

6.5.1 Preparing Documentation

Before commissioning a camera, prepare the following documents in addition to this
document.
Table 6-21 Documentation for commissioning preparation
Component
IPC6325-WD-VR
VCN500/VCN510/VCN520
/VCN540

6.5.2 Networking Scenarios

Smart ETH Gateway Networking Scenario
Issue 06 (2020-04-22)
If there are multiple VCNs for multiple smart modules, you are advised to evenly
distribute the cameras to each VCN.
A maximum of four cameras can be connected in the smart ETH gateway networking
scenario.
Copyright © Huawei Technologies Co., Ltd.
Normal Connection
Status
The room door is opened
properly.
Document
IPC6325-WD-VR Configuration Guide
VCN500: VCN500 Product Documentation
VCN510/VCN520/VCN540:
VCN510&VCN520&VCN540 Product Documentation
6 Feature Description
Follow-up Procedure
Remove the short-circuit
cable from the wiring
terminals NC and COM or
NO and COM on the
emergency door release
button.
132

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecc800-pro

Table of Contents