Huawei ECC800 User Manual page 192

Data center controller
Hide thumbs Also See for ECC800:
Table of Contents

Advertisement

ECC800 Data Center Controller
User Manual (for ECC800-Pro)
Step 3 Set Battery shallow discharge test to On.
Step 4 On the Linkage Logical List tab page, click Add or the edit icon
Figure 6-47 Setting parameters for Linkage Logic List
----End
Issue 06 (2020-04-22)
Copyright © Huawei Technologies Co., Ltd.
6 Feature Description
.
181