7. Install PTO drive shaft sub–assembly:
A. Insert block (Item 9) into pin of shift arm. Apply
moly disulfide grease onto both sides of block before
installing.
B. Put shifter of PTO drive shaft sub–assembly
(Item 3) on the block.
C. Install gear (Item 7) with bushing and washer
(Item 6) onto drive shaft after sliding the assembly
toward PTO shaft side. Apply moly disulfide grease
to bushing of gear and washer before installing.
D. Install 2 bearings (Item 5, 4) onto drive shaft by
hand.
E. Insert 2 snap rings (Item 2, 1).
Drive Train
3
4
Page 6 – 62
7
Figure 155
3
Figure 156
6
7
Figure 157
Moly disulfide
grease
Figure 158
Workman 3000/4000 Series
6
5