Toro Workman 3000 Series Service Manual page 298

Hide thumbs Also See for Workman 3000 Series:
Table of Contents

Advertisement

Power Take–Off (PTO) Reassembly
NOTE: Item numbers in figures are shown in reverse or­
der of assembly; for example, when reassembling,
install Item 1 last.
1. Clean gasket material from mating surfaces of case
and cover.
IMPORTANT: Be careful not to damage mating sur­
faces when removing gasket material.
2. Make sure all parts should be free of dirt and dust.
3. Assemble shift arm:
A. Install 2 new O–rings (Item 1) onto shift arm. Ap ­
ply moly disulfide grease to O–rings before instal­
ling.
B. Apply moly disulfide grease to arm pin and shaft.
C. Install shift arm into PTO case.
D. Install arm onto shift arm
E. Drive lock pins into arm and shift arm. Pay atten ­
tion to direction of slit in lock pins.
Drive Train
3
Page 6 – 60
2
1
Figure 148
Figure 149
5
Figure 150
Workman 3000/4000 Series

Advertisement

Table of Contents
loading

This manual is also suitable for:

Workman 4000 seriesWorkman 3100Workman 4300-d3200

Table of Contents