GE N60 Instruction Manual page 106

Network stability and synchrophasor measurement system
Hide thumbs Also See for N60:
Table of Contents

Advertisement

FRONT PANEL INTERFACE
EnerVista UR Setup software is installed and operational
The N60 settings have been saved to a settings file
The UR front panel label cutout sheet (GE part number 1006-0047) has been downloaded from
http://www.gedigitalenergy.com/products/support/ur/URLEDenhanced.doc
Small-bladed knife
To create custom LED labels for the enhanced front panel display:
1.
Start the EnerVista UR Setup software.
2.
Select the Front Panel Report item at the bottom of the navigation menu for the settings file. The front panel report
window displays.
4
3.
Enter the text to appear next to each LED and above each user-programmable pushbutton in the fields provided.
4.
Feed the UR front panel label cutout sheet into a printer and press the Print button in the front panel report window.
5.
When printing is complete, fold the sheet along the perforated lines and punch out the labels.
6.
Remove the UR label insert tool from the package and bend the tabs as described in the following procedures. These
tabs are used for removal of the default and custom LED labels.
Use the tool EXACTLY as outlined as follows, with the printed side containing the GE part number facing the
user.
NOTE
The label package shipped with every N60 contains the three default labels, the custom label template sheet, and the label
removal tool.
If the default labels are suitable for your application, insert them in the appropriate slots and program the LEDs to match
them. If you require custom labels, use the following procedures to remove the original labels and insert the new ones.
4-20
Figure 4-22: Front panel report window
N60 NETWORK STABILITY AND SYNCHROPHASOR MEASUREMENT SYSTEM – INSTRUCTION MANUAL
CHAPTER 4: INTERFACES
and printed

Advertisement

Table of Contents
loading

Table of Contents