GE N60 Instruction Manual page 46

Network stability and synchrophasor measurement system
Hide thumbs Also See for N60:
Table of Contents

Advertisement

WIRING
CHAPTER 3: INSTALLATION
Figure 3-7: Zero-sequence core balance CT installation
3
The phase voltage channels are used for most metering and protection purposes. The auxiliary voltage channel is used as
input for the synchrocheck and volts-per-hertz features, which are optional features available for some UR models.
Substitute the tilde "~" symbol with the slot position of the module in the following figure.
NOTE
Figure 3-8: CT/VT module wiring
Current inputs
Voltage inputs
8F, 8G, 8L, and 8M modules (4 CTs and 4 VTs)
Current inputs
8H, 8J, 8N, and 8R modules (8 CTs)
~
Voltage inputs
8V modules (8 VTs)
842809A1.CDR
3-8
N60 NETWORK STABILITY AND SYNCHROPHASOR MEASUREMENT SYSTEM – INSTRUCTION MANUAL

Advertisement

Table of Contents
loading

Table of Contents