Setting And Adding A Ups2000-G - Huawei ECC800 User Manual

Data center controller
Hide thumbs Also See for ECC800:
Table of Contents

Advertisement

ECC800 Data Center Controller
User Manual
Step 4 Tap
----End

5.3.2 Setting and Adding a UPS2000-G

Procedure
Step 1 Set monitoring parameters for the 3 kVA UPS2000-G.
Table 5-1 Setting a device address
Device
Toggle
Address
Switch 1
1
ON
2
OFF
3
ON
4
OFF
Step 2 Set monitoring parameters for the 6 kVA UPS2000-G or 10 kVA UPS2000-G.
Table 5-2 Setting a device address
Device
Toggle
Address
Switch 1
1
OFF
2
ON
3
OFF
4
ON
Step 3 Adding a UPS2000-G.
Issue 06 (2020-01-02)
to go back to the main menu screen.
After setting parameters for the integrated UPS, connect the integrated UPS to the ECC800.
Operate the DIP switch SW1 on the optional Modbus card to set the UPS2000-G device
address. Toggle switches 1 to 8 of DIP switch SW1 specify the device address in binary
mode. ON indicates 1, and OFF indicates 0.
Toggle
Toggle
Switch 2
Switch 3
OFF
OFF
ON
OFF
ON
OFF
OFF
ON
Operate the DIP switch S2 on the optional Modbus card to set the UPS2000-G device
address. Toggle switches 1 to 8 of DIP switch S2 specify the device address in binary
mode. ON indicates 0, and OFF indicates 1.
Toggle
Toggle
Switch 2
Switch 3
ON
ON
OFF
ON
OFF
ON
ON
OFF
Copyright © Huawei Technologies Co., Ltd.
Toggle
Toggle
Switch 4
Switch 5
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
Toggle
Toggle
Switch 4
Switch 5
ON
ON
ON
ON
ON
ON
ON
ON
5 Power-On Commissioning
Toggle
Toggle
Switch 6
Switch 7
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
Toggle
Toggle
Switch 6
Switch 7
ON
ON
ON
ON
ON
ON
ON
ON
Toggle
Switch
8
OFF
OFF
OFF
OFF
Toggle
Switch
8
ON
ON
ON
ON
92