5.3 Setting and Adding Devices

5.3.1 Setting Integrated UPS Parameters

Prerequisites
In this example, a straight-through cable is used to connect the integrated UPS to the PoE port
on the smart ETH gateway.
Procedure
Step 1 Start the integrated UPS, and tap System Info on the LCD.
Step 2 Choose System Info > Settings, enter the user name admin and password 000001, and then
tap
Step 3 Choose Settings > Communication, and set IP address assign to Automatic(DHCP).
Step 4 Tap
----End

5.3.2 Setting and Adding a UPS2000-G

Prerequisites
In this example, a straight-through cable is used to connect the UPS2000-G to the COM port
on the ECC800.
Procedure
Step 1 Set monitoring parameters for the 3 kVA UPS2000-G.
Table 5-1 Setting a device address
Device
Addre
ss
Issue 02 (2019-02-28)
. In the displayed dialog box for confirming the password, tap OK.
If you enter incorrect passwords for three consecutive times, you will be locked out for 5 minutes.
to go back to the main menu screen.
After setting parameters for the integrated UPS, the ECC800 discovers the access from the integrated
UPS automatically.
Operate the DIP switch SW1 on the optional Modbus card to set the UPS2000-G device
address. Toggle switches 1 to 8 of DIP switch SW1 specify the device address in binary
mode. ON indicates 0, and OFF indicates 1.
Toggle
Toggle
Switch
Switch
1
2
Copyright © Huawei Technologies Co., Ltd.
Toggle
Toggle
Toggle
Switch
Switch
Switch
3
4
5
5 Power-On Commissioning
Toggle
Toggle
Toggle
Switch
Switch
Switch
6
7
8