Step 1 Set monitoring parameters for the hydrogen detection system.
1.
Table 5-18 Setting a device address
Address
1
5
10
15
Step 2 Add the hydrogen detection system.
1.
2.
Issue 06 (2020-01-02)
Parameter
Name
Communications
port
Device address
Click Connect Test to check whether the AC meter connects to the ECC800 properly.
If the AC meter connects to the ECC800 properly, click Add Device.
If the AC meter does not connect to the ECC800 properly, check whether the cable
between the AC meter and the ECC800 is connected properly, whether the AC
meter and ECC800 are running properly, and whether the input parameters are the
consistent with the AC meter parameters.
Set the address for the hydrogen detection system using the DIP switch on the hydrogen
detection system module.
The DIP switch consists of toggle switches 1-4 (from left to right) which specify the
address of the hydrogen detection system. 0 indicates OFF, and 1 indicates ON.
Toggle
Switch 1
ON
ON
OFF
OFF
Log in to the ECC800 WebUI as an administrator.
Add the hydrogen detection system.
The setting example indicates that the hydrogen detection system is connected to the
COM1 port on the ECC800. If the hydrogen detection system is connected to another
port, set the number of the connected port.
Copyright © Huawei Technologies Co., Ltd.
Setting
Select COM2 from the drop-down list box.
In this example, set Device address to 1. Set the
actual device address of the AC meter during
operations.
Table 5-18
describes how to set the DIP switch.
Toggle
Switch 2
ON
OFF
ON
OFF
5 Power-On Commissioning
Toggle
Toggle
Switch 3
Switch 4
ON
OFF
ON
OFF
OFF
ON
OFF
OFF