Creating An Ecc800 On The Neteco - Huawei ECC800 User Manual

Data center controller
Hide thumbs Also See for ECC800:
Table of Contents

Advertisement

ECC800 Data Center Controller
User Manual
Path
Communication
Parameters
----End

6.1.3 Creating an ECC800 on the NetEco

Prerequisites
Context
For detailed operations, see iManager NetEco 6000 V600R007C90 Device Installation and
Commissioning Guide of the corresponding version.
Procedure
1.
2.
3.
Issue 06 (2020-01-02)
Parameter
Default
Value
Backup Server IP
192.168.0.10
Port Number
31220
Link to the
WAN_1
monitoring IP
address
You have logged in to the NetEco client by web browser.
You have created modules or container in Data Center Planning.
Choose Configuration > Configuration Management > Data Center Planning from
the main menu. The Data Center Planning window is displayed.
Click
in the upper left area of the Data Center Planning window to switch to the
Uncreated Device Information window.
Click
in the Uncreated Device Information window to switch to the Add Device
window. You can add an ECC800 device to the specified modular in the Add Device
window. For detailed operations, see
Copyright © Huawei Technologies Co., Ltd.
Setting
The NetEco IP address and the ECC800 IP address must
be configured in the same network to ensure normal
connection between the NetEco and the ECC800.
IP address of the backup NetEco server
NOTE
Set Backup Server IP to the same value as Primary
Server IP.
31220
WAN_1
Figure
6-1.
6 Remote Management
151