5.3.5 Setting NetCol5000-C030 Parameters (over Modbus TCP)

Prerequisites
In this example, a straight-through cable is used to connect the NetCol5000-C030 to the PoE
port on the smart ETH gateway.
Procedure
Step 1 Set NetCol5000-C030 monitoring parameters.
1.
2.
3.
Step 2 Set the running parameters and control parameters for the NetCol5000-C030 on the WebUI.
1.
2.
3.
4.
Issue 02 (2019-02-28)
If the SUNRISE-SCU-20K does not connect to the ECC800 properly, check
whether the cable between the SUNRISE-SCU-20K and the ECC800 is connected
properly, whether the SUNRISE-SCU-20K and ECC800 are running properly, and
whether the input parameters are consistent with the SUNRISE-SCU-20K
parameters.
Choose Monitoring > System > ETH Converter Group > ETH Converter n >
Running Parameters and set Device name to ETH Converter_device position.
Choose Monitoring > Air Conditioner > SUNRISE-SCU-20K n > Running
Parameters and set Device name to SUNRISE-SCU-20K_device position.
On the Running Parameters tab page, set smart cooling product running parameters,
temperature and humidity parameters, and alarm parameters.
On the Controls tab page, set the smart cooling product control parameters (such as
on/off control parameters).
Enter the NetCol5000-C030 home page, click Settings, choose user name Admin and
enter password 000001. After login, the settings screen of the NetCol5000-C030 is
displayed.
Choose Settings > Comm Settings > IP Settings, set IP assigning mode to
Automatic(DHCP), and tap Submit.
Choose Settings > Comm Settings > Modbus Settings, and set Connection mode to
Server, Server encryption to Enable.
After setting parameters for the NetCol5000-C030, the ECC800 discovers the access from the smart
cooling product automatically.
The earlier version has Protocol setting on the screen. The actual screen prevails.
Log in to the ECC800 WebUI as an administrator.
Choose Monitoring > Air Conditioner > NetCol5000-C0301.
0301 in NetCol5000-C0301 is variable and subject to change with the smart cooling product model and
connection sequence. 030 indicates the 30 kW model, and 1 indicates the smart cooling product
connection sequence. The displayed value prevails.
On the Running Parameters tab page, set smart cooling product running parameters,
temperature and humidity parameters, and alarm parameters.
On the Controls tab page, set the smart cooling product control parameters (such as
on/off control parameters).