Huawei ECC800 User Manual page 118

Data center controller
Hide thumbs Also See for ECC800:
Table of Contents

Advertisement

ECC800 Data Center Controller
User Manual
2.
3.
Step 2 Add a PMAC625.
1.
2.
Table 5-12 Adding a PMAC625
Path
System
Settings >
Device
Management
Issue 02 (2019-02-28)
Figure 5-6 Programming screen of the PMAC625
Enter the communications address setting screen by pressing
to confirm the setting.
Select the place of the communications address value to be modified by pressing
or
, modify the communications address value (ranging from 1 to 247) by pressing
or
, and then press
Figure 5-7 Communications address of the PMAC625
Log in to the ECC800 WebUI as an administrator.
Add a PMAC625.
Parameter
Name
Device type
Connect to
Communications
port
Copyright © Huawei Technologies Co., Ltd.
to save the setting.
Setting
Select PMAC625 from the drop-down list box.
Select ETH Converter n from the drop-down list
box.
Select COM1/COM2 from the drop-down list box.
5 Power-On Commissioning
or
, and press
109