Huawei ECC800 User Manual page 76

Data center controller
Hide thumbs Also See for ECC800:
Table of Contents

Advertisement

ECC800 Data Center Controller
User Manual
Appearance
Figure 3-39 CIM front view
(1) –48 V 0.5 A port (power
input)
(4) COM_OUT port (RS485
communication output)
(7) RF_Z antenna port
(10) Networking switch
(13) ALM indicator
Issue 02 (2019-02-28)
Identifies loose battery terminals and battery terminal overtemperature, and controls
battery switch tripping.
Supports WebUI display, northbound communication over FE and RS485, and a
third-party NMS.
Supports CIM and BIM online upgrade on the monitoring system.
If the upgrade package is transmitted to the CIM, and the upgrade is complete. The BIM upgrade is
finished through the CIM backend.
Copyright © Huawei Technologies Co., Ltd.
(2) PoE port
(5) DI and DO ports
(8) BCB_1–BCB_4
ports
(11) PWR indicator
(14) RF_Z indicator
3 Device Description
(3) COM_IN port (RS485
communication input)
(6) HALL_1–HALL_8 current
monitoring ports
(9) BCB_OUT and BCB_IN
ports
(12) RUN indicator
(15) Delivered antenna
67

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents