5.7.3.3 Commissioning a Electrode water sensor

If a water sensor is installed, perform the following steps to configure it.
Context
If the sensor is prefabricated, only check its settings.
Procedure
Step 1 Set water sensor parameters.
1.
2.
3.
4.
5.
Step 2 Check functions of water sensors.
Table 5-30 Function commissioning
Check Method
Immerse the two contacts of the
electrode water sensor in water.
----End

5.7.4 Commissioning a Temperature Sensor

5.7.4.1 Commissioning a Temperature Sensor (Connected to the AI/DI port
on the ECC800)
If a temperature sensor is installed, perform the following steps to configure it.
Context
Procedure
Step 1 Set temperature sensor parameters.
Issue 02 (2019-02-28)
In this example, the water sensor is connected to the AI/DI_3 port on the ECC800.
Log in to the ECC800 WebUI as an administrator.
Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_3 Port
Settings.
Set AI/DI_3 sensor to Enable, and click Submit.
Set AI/DI_3 sensor name to Leak sensor.
Set AI/DI_3 sensor type to Leak sensor(Electroc). Ensure that AI/DI_3 power supply
is Yes, and click Submit.
If the sensor is prefabricated, only check its settings.
The actual value prevails. Only the method of the parameter settings is described.
Copyright © Huawei Technologies Co., Ltd.
Normal Connection Status
Leak sensor AI/DI_3 DI alarm is generated on the
active alarm screen of the app or on the WebUI.