Application Scenarios; Ecc800 System Network Diagram (Fusionmodule5000); Ecc800 System Network Diagram (Fusionmodule2000) - Huawei ECC800 User Manual

Data center controller
Hide thumbs Also See for ECC800:
Table of Contents

Advertisement

ECC800 Data Center Controller
User Manual

2.2 Application Scenarios

2.2.1 ECC800 system network diagram (FusionModule5000)

The system network diagram uses FusionModule5000 V100R001C02 as an example.
Figure 2-3 ECC800 system network diagram (FusionModule5000)

2.2.2 ECC800 system network diagram (FusionModule2000)

The system network diagram uses FusionModule2000 V500R002C01 as an example.
Issue 02 (2019-02-28)
The new main way consists of general input units and power distribution units. It integrates the
smart ETH gateway and power distribution functions.
In the figure, RF_Z indicates wireless networking. RF_Z(1) devices can communicate with the
ECC800 in wireless mode. The RF_Z(2) BIM and CIM communicate with each other in wireless
mode. RF_Z(1) and RF_Z(2) devices use different protocols and are isolated from each other.
Wireless communication is automatically established after the access actuator, skylight actuator, and
multi-functional sensor successfully connect to and communicate with the ECC800 through PoE.
Copyright © Huawei Technologies Co., Ltd.
2 Overview
4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents