Download Print this page

Toshiba GR200 Series Instruction Manual page 540

Hide thumbs Also See for GR200 Series:

Advertisement

§§Note: The "SPOS01_OEX-BO" signal is issued when Fixlogic is set for scheme switch
[SPOS01-LGCFEXOT]. The "Operate completed "signal can also be issued from
logic programmed by the user, in place of the logic shown in Figure 4.1-20. The
user-programmed logic is connected internally to the signal "Operate completed",
hence this signal is now generated by the user-programmed logic at connection
point # 2 "user-configurable condition". That is, set the scheme switch [SPOS01-
LGCFEXOT] to PLC and use "SPOS01IN_TMP_42".
Output signal to BO
The SPOS01 function, in Figure 4.1-20, can issue an "Operate" signal at the output point
"SPOS01_OEX_BO", when the SPOS01 function determines that the received signal "Remote-
On-Control" is true.
- 519 -
6F2S1915 (0.46)
GRZ200 (Soft 031 & 032)

Advertisement

loading

This manual is also suitable for:

Grz200