Download Print this page

Toshiba GR200 Series Instruction Manual page 838

Hide thumbs Also See for GR200 Series:

Advertisement

logic programmed by the user in place of the logic shown in Figure 4.9-26. The
user-programmed logic is connected internally to the "operate completed" signal,
hence this signal is now generated by the user-programmed logic at connection
point#2 "User configurable condition". That is, set the scheme switch [TPOS01-
LGP1EXOT] to PLC and use "TPOS01IN_TMP_38".
Output signal to BO
The TPOS01 function, in Figure 4.9-31, can issue an "Operate" signal at the output-point
"TPOS01_P3EX_BO", when the TPOS01 function determines that the input signal "Remote-
P3-Control" is true.
Receiving "Operate command P1-control" from the local-end
(iv)
Figure 4.9-32 depicts the operation logic of the operate command 'P1-control' from the local-
end.
Wait for a command
Select logics
P1 control from the remote-end
P2 control from the remote-end
P3 control from the remote end
P1 control from the local-end
P2 control from the local-end
P3 control from the local-end
P1 control by the PLC function
P2 control by the PLC function
P3 control by the PLC function
Figure 4.9-32 Outline of Operate command 'P1-control'
Input signal generated at the local-end
Figure 4.9-33 illustrates the operate logic when an "Operate command P1 (Local-P1-Control)"
signal is applied to the TPOS01 function. The signal is provided when "P1-control" is keyed on
the IED front panel.
Wait for a next command
P1 control from the remote-end
P2 control from the remote-end
P3 control from the remote end
P1 control from the local-end
Operate logic
Signal reception from the
front panel
P2 control from the local-end
P3 control from the local-end
P1 control by the PLC function
P2 control by the PLC function
P3 control by the PLC function
- 817 -
6F2S1915 (0.46)
Success
Operation
Signal output
decision
Do nothing
Failed
GRZ200 (Soft 031 & 032)

Advertisement

loading

This manual is also suitable for:

Grz200