Download Print this page

Toshiba GR200 Series Instruction Manual page 860

Hide thumbs Also See for GR200 Series:

Advertisement

Measurement of operation Intervals
4.9.5
The TPOS01 function can measure operation intervals time†, the intervals OT1 and OT2 can
represent the period of time when an earth-switch changes a position from another position.
As shown in Table 4.9-27 the eight intervals are defined as switching as shown in Figure 4.9-50
to Figure 4.9-53. The user should set scheme switch [TPOS01-OPETMEN] On.
Signal "TPOS01_P2EX_BO"
Sensing intermediate state
P1
P2
P3
P2-control
a. Switch motion (P1 to P2)
Figure 4.9-50 Two Intervals (OT1 and OT2) for P2 control
Signal "TPOS01_P1EX_BO"
P1
P2
P3
P1-control
a. Switch motion (P2 to P1)
Figure 4.9-51 Two Intervals (OT3 and OT4) for P1 control
Signal "TPOS01_P2EX_BO"
P1
P2
P3
P2-control
a. Switch motion (P3 to P2)
Figure 4.9-52 Two Intervals (OP5 and OP6) for P2 control
Signal "TPOS01_PT_P1"
Signal "TPOS01_PT_P2"
Signal "TPOS01_PT_P3"
b. Operate command and signals with regard to the switch motion (P1 to P2)
Sensing intermediate state
Signal "TPOS01_PT_P1"
Signal "TPOS01_PT_P2"
Signal "TPOS01_PT_P3"
b. Operate command and signals with regard to the switch motion (P2 to P1)
Sensing Intermediate state
Signal "TPOS01_PT_P1"
Signal "TPOS01_PT_P2"
Signal "TPOS01_PT_P3"
b. Operate command and signals with regard to the switch motion (P3 to P2)
- 839 -
Intermediate
Intermediate
OT1
OT2
Intermediate
Intermediate
OT3
OT4
Intermediate
Intermediate
OT5
OT6
6F2S1915 (0.46)
GRZ200 (Soft 031 & 032)

Advertisement

loading

This manual is also suitable for:

Grz200