CHAPTER 2. Installation of RRH-P4
E) Install pulling wire to the 3.28 ft (1 m) point of (RRH side) hybrid cable's junction box (breakout point)
bottom. Wind the pulling wire by 7 times or more to the 3.28 ft (1 m) or more length of hybrid cable.
Min. 1 m
Junction Box
Pulling Wire
(Breakout Point)
Min. 3.28 ft (1 m)
7
6
5
4
3
2
1
Figure 2.20 Installing Hybrid cable (3)