Cable Gland Assembly And Cabling Procedure; Figure 2.4 Cable Gland Assembly And Cable Installation Procedure (1) - Samsung Smart MBS RRH-P4 Installation Manual

Table of Contents

Advertisement

2600-00CTEIGAA
Ver.
CHAPTER 2. Installation of RRH-P4

2.4.2 Cable Gland Assembly and Cabling Procedure

Follow the cable gland assembly instructions below to prevent influx of moisture and
foreign substances.
1) Check the cable gland built on the unit whether it has the protection cover inside the cable gland nut
as shown in the picture below (cross-section picture of outer wall of the unit), the same as the original
factory configuration..
[Cross-section]
2) Separate the cable gland nut by loosening counterclockwise.
Here, check the protection cover (circular transparent plate).
[Loosened Cable Gland Nut]
3) Remove the protection cover (circular transparent plate) and keep it separately.
[Removed Protection Cover]

Figure 2.4 Cable Gland Assembly and Cable Installation Procedure (1)

2-6
4.0
Protection Cover
Protection Cover
Cable Gland Nut
Cable Gland Nut
Protection Cover
© SAMSUNG Electronics Co., Ltd.

Advertisement

Table of Contents
loading

Table of Contents