Samsung Smart MBS RRH-P4 Installation Manual page 112

Table of Contents

Advertisement

2600-00CTEIGAA
Ver.
ANNEX B. Feeder Line Work
3) Insert the ground kit clamp into the place from which the feeder line sheath is removed.
4) Pull the clamp lock to the upward so that the lock can be hung on the global protrusion area on the side.
5) Overlap the exposed part of the ground kit clamp using rubber tape (Keep a distance as the half size of
rubber tape) and press it with your hands lightly to make rubber tape adhere well.
6) Wrap the part where the rubber tape is attached using insulation tape two times or more. When cutting
off the tape, cut it off neatly using a cutting device such as scissors or a knife.
3
Feeder Line
Clamp Lock
5
Rubber Tape
6
Insulation Tape
B-6
4.0
Ground Kit Clamp
Figure B.2 Feeder Cable Grounding (2)
4
Protrusion
Scissors (knife)
© SAMSUNG Electronics Co., Ltd.

Advertisement

Table of Contents
loading

Table of Contents