Antenna Feeder Cable Ground - Samsung Smart MBS RRH-P4 Installation Manual

Table of Contents

Advertisement

2600-00CTEIGAA
Ver.
B.2 Antenna Feeder Cable Ground
Ground the antenna feeder line using the grounding kit located under the Tower Ground
Bar (TGB) installed in the lower section of the tower or in the antenna feeder line duct.
The way to connect the ground kit of feeder is as follows:
Ground Kit
1) Remove about 55 mm of the sheath of cable when the 2.17 in. (55 mm). feeder cable is used.
2) Open it by returning hook of the clamp fixing for Ground kit in the left direction.
1
© SAMSUNG Electronics Co., Ltd.
4.0
Insulation Tape
2
Figure B.1 Feeder Cable Grounding (1)
Smart MBS RRH-P4 Installation Manual/Ver.3.0
Rubber Tape
M6 × 25L Hex. Bolt
M6 Spring Washer
M6 Plane Washer
M6 Plane Washer
M6 Spring Washer
M6 Hex. Nut
B-5

Advertisement

Table of Contents
loading

Table of Contents