Toro GreensPro 1240 Service Manual page 69

Hide thumbs Also See for GreensPro 1240:
Table of Contents

Advertisement

Test Procedure (continued)
GreensPro
1240/1260
14211SL Rev A
Before opening the hydraulic system, press the motion control
pedals to release the pressure in the system and avoid injury from
the pressurized hydraulic fluid.
4. Clean the junction of the hydraulic hoses and straight fittings at the hydraulic
pump
(Figure
22). Tag the hoses to correspond with the pump ports (A and
B) then disconnect the hoses from the fittings. Plug the hoses to prevent
contamination from entering the system.
g274728
1.
Hydraulic pump
2.
Charge circuit test port
3.
Pump A port (travel right)
5. Remove the hydraulic fitting from the hydraulic pump B port. Plug pump B
port with a #8 SAE hydraulic plug.
6. Remove the plug from the charge circuit test port and install a male test
connector.
7. Install a #8 ORFS elbow and a male test connector to the hydraulic pump A
port.
CAUTION
Figure 22
4.
Pump B port (travel left)
5.
Pressure gauge – 0 to 500 psi
6.
Pressure gauge – 0 to 5000 psi
Page 5–23
Hydraulic System: Testing the Hydraulic System

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenspro 44812Greenspro 1260Greenspro 44913

Table of Contents