SmartAX MA5600T/MA5603T/MA5608T Multi-service
Access Module
Commissioning and Configuration Guide
----End
13.3.5.10 Verifying Services
This topic describes how to use the PDH/SDH tester to verify the private line access service.
Prerequisites
The private line service has been configured.
Networking
Figure 13-20 Test setup for E1 upstream service
E1 port
loopback
Procedure
Step 1 Set up network environment according to the preceding diagrams for service acceptance tests.
NOTE
Ensure clock synchronization for the test. It is recommended that the tester use the internal free-run clock, the
OLT trace the clock of the tester, and the ONU trace the clock of the OLT.
Step 2 Use the E1 line tester to send packets for the test.
The test duration must be 12 hours or longer. There should be no alarms on the tester and the
bit error rate must be less than 1E-9.
----End
Follow-up Procedure
When the test on service connectivity fails, you can check for the failure causes by performing
loopbacks. The following loopbacks are supported:
l
l
l
l
Issue 01 (2014-04-30)
huawei(protect-group-1)#protect-group enable
huawei(protect-group-1)#quit
ONU
ONU trace
the clock of
the OLT
Remote loopback on the OLT EDTB board
Local loopback on the OLT EDTB board
Local loopback on the ONU
Remote loopback on the ONU
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
13 FTTO Configuration (Large-sized Enterprise Access)
OLT
OLT trace
the clock of
the tester
E1 line tester
E1
Internal
free-run
clock
1343