Chapter 1
Install the Shelf and Backplane Cable
Figure 1-2
Slide the air filter into the shelf assembly.
Step 4
Return to your originating procedure (NTP).
Step 5
DLP-A5 Mount the Shelf Assembly in a Rack (One Person)
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Verify that the proper fuse and alarm panel has been installed in the top mounting space. If a fuse and
Step 1
alarm panel has not been installed, you must install one according to manufacturer's instructions.
Step 2
Ensure that the shelf assembly is set for the desired rack size (either 23 inches [584.2 mm] or 19 inches
[482.6 mm]).
March 2003
Installing the External Brackets
This task allows one person to mount the shelf assembly in a rack.
Pinned hex key
Two set screws (48-1003-XX)
# 2 Phillips screwdriver
DLP-A3 Reverse the Mounting Bracket to Fit a 19-inch (482.6 mm) Rack,
page
DLP-A4 Install the External Brackets and Air Filter, page
As needed
Onsite
None
If installing the 15454-SA-ANSI shelf assembly, a 100-A fuse panel (30-A fuse per shelf minimum)
is required.
If installing the 15454-SA-NEBS3 shelf assembly, a standard 80-A fuse panel (20-A fuse per shelf
minimum) is required.
1-6, if applicable
Cisco ONS 15454 Procedure Guide, R4.0
NTP-A2 Install the Shelf Assembly
1-8, if applicable
1-9