Chapter 1
Install the Shelf and Backplane Cable
Complete one of the following to power up the node:
Step 2
Using a voltmeter, verify the shelf for –48 VDC battery and ground:
Step 3
a.
b.
Return to your originating procedure (NTP).
Step 4
NTP-A7 Install the Fan-Tray Assembly
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Do not operate an ONS 15454 without a fan-tray air filter. A fan-tray air filter is mandatory.
Caution
The 15454-FTA3 fan-tray assembly can only be installed in ONS 15454 Release 3.1 or later shelf
Caution
assemblies (15454-SA-ANSI, 800-19857). It includes a pin that does not allow it to be installed in
ONS 15454 shelf assemblies released earlier than ONS 15454 Release 3.1 (15454-SA-NEBS3E,
15454-SA-NEBS3, and 15454-SA-R1, P/N 800-0714915454). Installing the 15454-FTA3 in a
noncompliant shelf assembly might result in failure of the alarm interface panel (AIP), which in turn,
will result in power loss to the fan-tray assembly.
March 2003
If you are using a 80-A fuse panel, insert a 20-A fuse into the fuse position according to site practice.
If you are using a 100-A fuse panel, insert a 30-A fuse into the fuse position according to site
practice.
To verify the A-side of the shelf, place the black lead of the voltmeter to the frame ground. Place the
red test lead to the BAT1 (A-side battery connection) red cable. Verify that it reads between
–42 VDC and –57 VDC. Then place the red test lead of the voltmeter to the RET1 (A-side return
ground) black cable and verify that no voltage is present.
Note
The voltages –42 VDC and –57 VDC are, respectively, the minimum and maximum voltages
required to power the chassis.
To verify the B-side of the shelf, place the black test lead of the voltmeter to the frame ground. Place
the red test lead to the BAT2 (B-side battery connection) red cable. Verify that it reads between
–42 VDC and –57 VDC. Then, place the red test lead of the voltmeter to the RET2 (B-side return
ground) black cable and verify that no voltage is present.
This procedure installs the fan-tray assembly.
#2 Phillips screwdriver
Medium slot-head screwdriver
Small slot-head screwdriver
NTP-A3 Open and Remove the Front Door, page 1-12
NTP-A6 Install the Power and Ground, page 1-23
Required
Onsite
None
NTP-A7 Install the Fan-Tray Assembly
Cisco ONS 15454 Procedure Guide, R4.0
1-29

Advertisement

loading