NTP-A9 Install the Electrical Card Cables on the Backplane
DLP-A27 Install Coaxial Cable with SMB Connectors
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Step 1
Place the SMB cable connector over the desired connection point on the backplane.
Step 2
Gently push the connector until it clicks into place.
Tie wrap or lace the cables to the EIA according to Telcordia standards (GR-1275-CORE) or local site
Step 3
practice.
Step 4
Route the cables to the nearest side of the shelf assembly into rack runs according to local site practice.
Figure 1-22 Installing Coaxial Cable with SMB Connectors
Metallic interfaces for connection to outside plant lines (such as T1/E1/T3/E3, etc.) must be connected
Warning
through a registered or approved device such as CSU/DSU or NT1.
Cisco ONS 15454 Procedure Guide, R4.0
1-52
This task installs the coaxial cable with SMB connectors. Refer to
Figure 1-22 on page 1-52
SMB cable connector
DLP-A13 Install an SMB EIA, page 1-19
Required if you are using DS3-12, DS3XM-6, or EC-1 cards and are using
an SMB interface rather than a BNC interface
Onsite
None
Chapter 1
Install the Shelf and Backplane Cable
when performing task.