NTP-A12 Install Ferrites
DLP-A30 Install Ferrites to Power Cabling
Purpose
Tools/Equipment
Prerequisite Procedures None
Required/As Needed
Onsite/Remote
Security Level
Step 1
If you are using block ferrites, wrap the cables once around and through the block ferrites.
Step 2
If you are using oval ferrites, pull the cable straight through the oval ferrites.
Note
Note
Figure 1-26 Attaching Block and Oval Ferrites to Power Cabling
Power terminals
Return to your originating procedure (NTP).
Step 3
Cisco ONS 15454 Procedure Guide, R4.0
1-58
This task attaches ferrites to power cabling. Use a single oval ferrite
(TDK ZCAT2035-0930) and/or one block ferrite (Fair Rite 0443164151)
for each pair of cables, depending on the EIA.
Oval and/or block ferrites
As needed
Onsite
None
If you are using both block and oval ferrites, place the oval ferrite between the ONS 15454 and
the block ferrite as shown in
Place the oval ferrite as close to the power terminals as possible and place the block ferrite within
5 to 6 inches (127 to 152 mm) of the power terminals.
Chapter 1
Figure 1-26 on page
1-58.
Install the Shelf and Backplane Cable
March 2003