Install the Shelf and Backplane Cable
Label the transmit, receive, working, and protect cables at each end of the connection to avoid confusion
Step 5
with cables that are similar in appearance.
Step 6
Return to your originating procedure (NTP).
NTP-A10 Route Electrical Cables
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
To route coaxial cables, complete the
Step 1
To route DS-1 twisted pair cables, complete the
Step 2
page
Continue with the
Step 3
Stop. You have completed this procedure.
DLP-A28 Route Coaxial Cables
Purpose
Tools/Equipment
Prerequisite Procedures One or more of the following tasks, as needed:
Required/As Needed
Onsite/Remote
Security Level
Step 1
Tie wrap or lace the coaxial cables according to local site practice and route the cables through the side
cutouts on either side of the ONS 15454. The rubber coated edges of the side cutouts prevent the cables
from chafing.
Use short lengths of pigtail RG179 to terminate the shelf assembly.
Step 2
March 2003
The following procedure explains how to route and manage electrical
(backplane) cables.
RG179, RG59 (735A) # 26 AWG cable, or RG59 (734A) # 20 AWG cable
NTP-A9 Install the Electrical Card Cables on the Backplane, page 1-45
Required if using electrical cards
Onsite
None
1-55.
"NTP-A11 Install the Rear Cover" procedure on page
This task routes the coaxial cables.
RG179, RG59 (735A) # 26 AWG cable, or RG59 (734A) # 20 AWG cable
Required
Onsite
None
"DLP-A28 Route Coaxial Cables" task on page
"DLP-A29 Route DS-1 Twisted-Pair Cables" task on
DLP-A25 Install Coaxial Cable With BNC Connectors, page 1-50
DLP-A26 Install Coaxial Cable With High-Density BNC Connectors,
page 1-51
DLP-A27 Install Coaxial Cable with SMB Connectors, page 1-52
NTP-A10 Route Electrical Cables
1-55.