NTP-A6 Install the Power and Ground
A readily accessible two-poled disconnect device must be incorporated in the fixed wiring.
Warning
When installing redundant power feeds, do not use aluminum conductors.
Warning
If you use redundant power leads to power the ONS 15454, disconnecting one lead will not remove
Warning
power from the node.
Always use the supplied ESD wristband when working with a powered ONS 15454. Plug the wristband
Caution
cable into the ESD jack located on the lower-right outside edge of the shelf assembly.
Complete the
Step 1
Rack" task on page
Complete the
Step 2
Complete the
Step 3
Complete the
Step 4
Continue with the
Step 5
Stop. You have completed this procedure.
DLP-A15 Verify that the Correct Fuse and Alarm Panel is Installed in the
Equipment Rack
Purpose
Tools/Equipment
Prerequisite Procedures None
Required/As Needed
Onsite/Remote
Security Level
Verify the following:
Step 1
Step 2
Return to your originating procedure (NTP).
Cisco ONS 15454 Procedure Guide, R4.0
1-24
"DLP-A15 Verify that the Correct Fuse and Alarm Panel is Installed in the Equipment
1-24.
"DLP-A16 Connect the Office Ground to the ONS 15454" task on page
"DLP-A17 Connect Office Power to the ONS 15454 Shelf" task on page
"DLP-A18 Turn On and Verify Office Power" task on page
"NTP-A7 Install the Fan-Tray Assembly" procedure on page
This task verifies that the proper fuse and alarm panel is installed in the
equipment rack.
None
Required
Onsite
None
If using the 15454-SA-ANSI shelf, a 100-A fuse panel (30-A fuse per shelf minimum) is installed.
If not, install one according to manufacturer's instructions.
If using the 15454-SA-NEBS3 shelf, a standard 80-A fuse panel (20-A fuse per shelf minimum) is
installed. If not, install one according to manufacturer's instructions.
Chapter 1
Install the Shelf and Backplane Cable
1-25.
1-26.
1-28.
1-29.