NTP-A13 Perform the Shelf Installation Acceptance Test
NTP-A13 Perform the Shelf Installation Acceptance Test
Purpose
Tools/Equipment
Tools/Equipment
Prerequisite Procedures Applicable procedures in Chapter 1
Required/As Needed
Onsite/Remote
Security Level
Step 1
Complete
Table 1-9
Description
NTP-A1 Unpack and Inspect the ONS 15454 Shelf Assembly, page 1-4
NTP-A2 Install the Shelf Assembly, page 1-5
NTP-A3 Open and Remove the Front Door, page 1-12
NTP-A4 Remove the Backplane Covers, page 1-15
NTP-A5 Install the Electrical Interface Assemblies, page 1-16
NTP-A6 Install the Power and Ground, page 1-23
NTP-A7 Install the Fan-Tray Assembly, page 1-29
NTP-A119 Install the Alarm Expansion Panel, page 1-31
NTP-A8 Install Wires to Alarm, Timing, LAN, and Craft Pin Connections, page 1-34
NTP-A120 Install an External Wire-Wrap Panel to the AEP, page 1-40
NTP-A9 Install the Electrical Card Cables on the Backplane, page 1-45
NTP-A10 Route Electrical Cables, page 1-53
NTP-A11 Install the Rear Cover, page 1-55
NTP-A12 Install Ferrites, page 1-57
Complete the
Step 2
Complete the
Step 3
Continue with the
Step 4
Stop. You have completed this procedure.
Cisco ONS 15454 Procedure Guide, R4.0
1-60
Use this procedure to perform a shelf installation acceptance test.
Voltmeter
Oval and/or block ferrites
Required
Onsite
None
Table 1-9
by verifying that each applicable procedure was completed.
Shelf Installation Task Summary
"DLP-A32 Inspect the Shelf Installation and Connections" task on page
"DLP-A33 Measure Voltage" task on page
"NTP-A15 Install the Common Control Cards" procedure on page
Chapter 1
Install the Shelf and Backplane Cable
1-61.
Completed
1-61.
2-2.