Cisco ONS 15327 User Documentation page 53

Hide thumbs Also See for ONS 15327:
Table of Contents

Advertisement

Chapter 1
Hardware Installation
1.2.2 User-Supplied Materials
These materials and tools are required but are not supplied with the ONS 15327.
1.2.2.1 Tools Needed
1.2.2.2 Test Equipment
June 2002
#10-32 x 3/8 pan head phillips power lug screws (2)
#12 AWG dual hole 5/8 in. spaced grounding lug
Electrostatic discharge (ESD) wrist strap with 1.8 m (6 ft.) coil cable (1)
Equipment rack (22 inches total width for a 19-inch rack; 26 inches total width for a 23-inch rack)
Fuse panel
Copper power cable (from fuse and alarm panel to assembly), #12-16 AWG
The National Electrical Code recommends #12-14 AWG power cable.
Ground cable, #12 AWG stranded (minimum)
Alarm cable, category 5 terminated with RJ-45 for all alarm connections
Building Integrated Timing Supply (BITS) clock cable, category 5 terminated with RJ-45
Single-mode SC fiber jumpers with UPC polish (55 dB or better) for OC12 and OC-48 cards and
fiber jumpers with LC connectors for the OC-3 card.
Shielded coaxial cable terminated with BNC connectors for DS-3 cards
Shielded ABAM cable terminated with CHAMP connectors for DS-1 cards with #22 or #24 AWG
ground wire (typically about two feet in length)
Tie wraps and/or lacing cord
Labels
#2 phillips screw driver
Medium slot head screw driver
Small slot head screw driver
Wire cutters
Wire strippers
Crimp tool
Needle nose pliers (for bail locks on CHAMP connectors)
Volt meter
Power meter (for use with fiber optics only)
Bit Error Rate (BER) tester, DS-1 and DS-3
Installation Equipment
Cisco ONS 15327 User Documentation, R3.3
1-3

Advertisement

Table of Contents
loading

Table of Contents