Step 3 In the address box of the browser, enter https://
Step 4 Enter the correct user name and password and click Login.
Step 5 On the WebUI, choose Monitoring > UPS System > Running Control, and click
Inv. ON, and confirm the operation to start the inverter.
Figure 7-2 Starting the inverter
----End

7.1.4 Powering On Loads

Context
After the inverter starts, the UPS transfers to inverter mode, and the Bypass mode
alarm on the MDU disappears.
Procedure
Step 1 After confirming that the battery string is properly connected, switch on the
battery string input circuit breaker. If there are multiple battery strings, switch on
the circuit breaker for each battery string and then the general circuit breaker
between the battery strings and the UPS. The No battery alarm on the MDU
disappears.
Step 2 Turn on the downstream output switch to supply power to loads.
----End

7.1.5 (Optional) Setting Parameters for the BCB Box

Prerequisites
A BCB box is installed.
Procedure
Step 1 Choose System Info > Settings > Dry Contact Set, set MUE05A connection to
Enable, and set BCB connection [OL] and Battery breaker [STA] to Enable.
Issue 05 (2021-10-13)
NO TE
If the power module receives a startup command when it cannot be started, the startup
command will be retained for 1 minute. Within 1 minute, if there is no situation (for
example, the power module encounters other faults, executes a shutdown command, or a
fault is rectified) that requires the startup command to be cleared and the power module
becomes able to start, then the power module responds to the startup command.