Huawei UPS5000-H User Manual page 160

100 kva power modules
Hide thumbs Also See for UPS5000-H:
Table of Contents

Advertisement

UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)
Figure 6-109 Installing signal cables
(1) Power cable hole
Step 4 Install battery cables.
Figure 6-110 Installing power cables between the UPS and the SmartLi
(1) Connect the ground cable of the battery string or its BBB box to the battery PE of the UPS
or the ground bar in the equipment room based on the site survey.
Step 5 Install top supports and covers of the battery terminal protective covers.
Issue 05 (2021-10-13)
NO TE
The figure uses the cable connection between the UPS and the SmartLi as an example.
Battery cables are connected to each SmartLi.
Copyright © Huawei Technologies Co., Ltd.
(2) Signal cable hole
6 Installation