Installation In Top Cabling Configuration; Installing Cabinets - Huawei UPS5000-H User Manual

100 kva power modules
Hide thumbs Also See for UPS5000-H:
Table of Contents

Advertisement

UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)

6.6.2 Installation in Top Cabling Configuration

Cables can be routed from the top if the optional top cabling component is
configured.

6.6.2.1 Installing Cabinets

Context
Power cabinet 1 and the inductor cabinet are transported separately. Power
cabinet 2 and the bypass cabinet are transported together.
Installation on the Floor
Ensure that the installation floor is flat.
Step 1 Determine the cabinet installation positions on the floor based on the holes in the
marking-off template for floor installation.
Figure 6-303 Hole dimensions (unit: mm)
(1) Power cabinet 1
Step 2 Use a hammer drill to drill holes for installing expansion bolts and then install
expansion sleeves in the holes.
1.
2.
3.
Issue 05 (2021-10-13)
NO TICE
NO TE
● A: mounting holes on the channel steel
● B: mounting holes on the floor
(2) Power cabinet 2
Drill a hole into the concrete floor using a hammer drill. The hole depth
ranges from 52 mm to 60 mm.
Partially tighten the expansion bolt and vertically insert it into the hole. Knock
the expansion bolt using a rubber mallet until the expansion sleeve is fully
inserted into the hole.
Partially tighten the expansion bolt.
Copyright © Huawei Technologies Co., Ltd.
(3) Bypass cabinet
6 Installation
(4) Inductor cabinet
258

Advertisement

Table of Contents
loading

Table of Contents