6.
Figure 6-189 Installing rectifiers and baffle plates
----End

6.4.5.3 Installing Copper Bars and Cables

1.
2.
3.
4.
Issue 05 (2021-10-13)
Install baffle plates for the vacant slots.
Install copper bars and cables by referring to Single UPS Installation (1200
kVA, Three-Phase Three-Wire) > Installation in Top Cabling Configuration
> Installing Copper Bars and Cables.
Install fan power cables by referring to Single UPS Installation (1200 kVA,
Three-Phase Three-Wire) > Installation in Top Air-Flow Configuration >
Installing Cables.
Install the top frame for the top air-flow cabinet.
Figure 6-190 Installing a top frame
Install the mounting plates for the top air-flow cabinet.