6.5.3 Installation in Bottom Cabling Configuration

Cables can be routed from the bottom if the optional bottom cabling cabinet is
configured.

6.5.3.1 Installing Cabinets

Installation on the Floor
Ensure that the installation floor is flat.
Step 1 Determine the cabinet installation positions on the floor based on the holes in the
marking-off template for floor installation.
Issue 05 (2021-10-13)
NO TE
● Do not bind signal cables and power cables together.
● RS485 cables and FE cables must be shielded cables.
● The figure uses the cable connection between the UPS and the SmartLi as an example.
NO TICE