Verifying The Installation And Filling The Sealing Putty - Huawei UPS5000-H User Manual

100 kva power modules
Hide thumbs Also See for UPS5000-H:
Table of Contents

Advertisement

UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)
Figure 6-416 Cable connection for an NC EPO port
Figure 6-417 Cable connection for an NO EPO port
6.13 Verifying the Installation and Filling the Sealing
Putty
Table 6-17
You need to carefully check items 08 and 09 listed in
results of these two items do not meet the acceptance criteria, the UPS may be
damaged.
Table 6-17 Check items and acceptance criteria
No.
01
Issue 05 (2021-10-13)
NO TE
● When you use the NC status, remove the jumper between EPO_NC and EPO_12V first.
When you turn off the EPO switch, EPO is triggered.
● When you use the NO status, ensure that the jumper is connected between EPO_NC and
EPO_12V. When you turn on the EPO switch, EPO is triggered.
lists check items and acceptance criteria.
NO TICE
Item
Cabinet installation
Copyright © Huawei Technologies Co., Ltd.
Table
6-17. If the check
Acceptance Criteria
The cabinets are securely installed and
do not tilt due to vibration.
6 Installation
322

Advertisement

Table of Contents
loading

Table of Contents