Huawei UPS5000-H User Manual page 287

100 kva power modules
Hide thumbs Also See for UPS5000-H:
Table of Contents

Advertisement

UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)
Figure 6-337 Hole dimensions (unit: mm)
(1) Bottom cabling
cabinet
Step 2 Use a hammer drill to drill holes for installing expansion bolts and then install
expansion sleeves in the holes.
1.
2.
3.
4.
Knock the expansion bolt into the hole until the expansion sleeve completely fits
into the hole. The expansion sleeve must be completely buried under the ground
to facilitate subsequent installation.
Figure 6-338 Drilling holes and installing expansion sleeves
(1) M12 bolt
Issue 05 (2021-10-13)
(2) Power cabinet 1
Drill a hole into the concrete floor using a hammer drill. The hole depth
ranges from 52 mm to 60 mm.
Partially tighten the expansion bolt and vertically insert it into the hole. Knock
the expansion bolt using a rubber mallet until the expansion sleeve is fully
inserted into the hole.
Partially tighten the expansion bolt.
Remove the bolt, spring washer, and flat washer.
NO TICE
Copyright © Huawei Technologies Co., Ltd.
(3) Power cabinet 2 +
bypass cabinet
(2) Spring washer
6 Installation
(4) Inductor cabinet
(3) Flat washer
277

Advertisement

Table of Contents
loading

Table of Contents