UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)
Step 5 Secure the cabinets.
Figure 6-97 Securing the cabinets
Step 6 Install anchor baffle plates.
Issue 05 (2021-10-13)
NO TE
There are sheet metal stiffeners at the bottom of the inductor cabinet. After the pallet
is removed, the pallet truck cannot transport the inductor cabinet from the front.
Therefore, reserve space on the side of the inductor cabinet or use other
transportation methods.
Figure 6-96 Installing the connecting kits and reinstalling the rear door panel
and side panel
NO TE
To meet the requirements of 9-intensity earthquake resistance, tighten 24 screws at the
bottom.
Copyright © Huawei Technologies Co., Ltd.
6 Installation
143