Procedure
Step 1 Install equipotential ground cable for cabinets.
Figure 6-39 Installing equipotential ground cable for cabinets
Step 2 (Optional) Remove the copper bars between the mains input and bypass input.
Perform this step only when the mains input and bypass input use different power
sources.
1.
2.
3.
4.
Issue 05 (2021-10-13)
NO TE
The number and colors of cables in the following figures are for reference only.
NO TICE
Remove the covers.
Figure 6-40 Removing the covers
Remove the screws that secure the guide rail of the SPD.
Place the SPD on the horizontal plate (without removing the cables).
Remove the copper bars.