Table 6-10 Port mapping table
Cable
Cable 1
Cable 2
Cable 3
Figure 6-214 Installing signal cables inside the cabinets
Step 3 Install conversion copper bars from right to left and remove the left and right
connecting kits from the top of the cabinets.
Issue 05 (2021-10-13)
Position of Wiring Terminal
1
Cabinet
Power cabinet
1
Power cabinet
1
Power cabinet
1
Copyright © Huawei Technologies Co., Ltd.
Position of Wiring Terminal
2
Port
Cabinet
PU XS1
Power cabinet
2
Signal
Power cabinet
2
One end of
Bypass
the NTC cable
cabinet
is preinstalled.
The other end
is reserved
inside the
cabinet and
needs to be
connected to
the bypass
cabinet.
6 Installation
Port
PU XS1
Signal
XS5
211