Huawei UPS5000-H User Manual page 210

100 kva power modules
Hide thumbs Also See for UPS5000-H:
Table of Contents

Advertisement

UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)
Figure 6-193 Drilling holes and installing expansion sleeves
(1) M12 bolt
(4) Expansion sleeve
Step 3 Remove the screws preinstalled on the copper bars in power cabinet 2 and store
them for future use.
Figure 6-194 Removing the preinstalled screws
Step 4 Move the cabinets to the mounting holes.
Step 5 Remove the power distribution covers from power cabinets 1 and 2.
Figure 6-195 Removing the covers
Issue 05 (2021-10-13)
(2) Spring washer
(5) Expansion nut
Copyright © Huawei Technologies Co., Ltd.
6 Installation
(3) Flat washer
(6) Concrete floor
200

Advertisement

Table of Contents
loading

Table of Contents