6.1.4 Unpacking

Context
● Only trained personnel are allowed to move the UPS. Use a pallet truck to
● To prevent the UPS from falling over, secure it to an electrical pallet truck using
● Move the UPS with caution to avoid bumping or toppling, which may damage
● If the UPS installation environment is in poor condition and the UPS needs to
Procedure
Step 1 Use a pallet truck to transport the UPS to the installation position.
Step 2 Remove the UPS outer packing.
Step 3 After confirming that the UPS is intact, remove the bolts that secure the UPS to
the pallet and remove the UPS from the pallet.
Figure 6-29 Unpacking (1600 kVA power cabinet 1)
Issue 05 (2021-10-13)
NO TE
● The input circuit breakers recommended are for reference only.
● If multiple loads are connected, use recommended specifications for branch circuit
breakers.
● The circuit breaker selection principle is to protect loads and cables, and the cascading
principle is to achieve specific protection.
NO TICE
transport the UPS case secured to a wooden support to the installation
position.
ropes before moving it.
the UPS. After placing the case in the installation position, unpack it with
caution to prevent scratches. Keep the UPS steady during unpacking.
be stored for a long time after it is unpacked, take measures to prevent dust. It
is recommended that the UPS be wrapped with the original plastic coat.