Optional) Concrete Platform Scenario - Huawei NetCol8000-E220 User Manual

Modular indirect evaporative cooling system
Hide thumbs Also See for NetCol8000-E220:
Table of Contents

Advertisement

NetCol8000-E220 Modular Indirect Evaporative
Cooling System
User Manual
Table 3-4 Cable terminal requirements
Item
Main power
supply
Standby
power supply
Cooling
power supply

3.3 (Optional) Concrete Platform Scenario

Prerequisites
The evenness of concrete platforms is critical to equipment installation. Ensure
that the height (altitude) difference of all platforms does not exceed 5 mm.
Issue 06 (2020-08-19)
NO TE
The site ground resistance must be less than 0.1 ohm.
The cable flame spread rating must be at least VB.
When selecting, connecting, and routing power cables, follow local safety regulations and
rules.
When the external conditions such as cable layout or ambient temperatures change,
perform verification in accordance with the IEC-60364-5-52 or the local regulations.
The recommended cables are applicable only when the following requirements are met:
● The cables are routed over a ladder or bracket in a single layer (E or F in
IEC60364-5-523). The distance between the cable and the cable is twice the diameter of
the cable.
● The ambient temperature is 30°C.
● The AC voltage loss is less than 3%, and the DC voltage loss is less than 1%.
● Single- or multi-core 90°C soft power cables with copper conductors are used.
● It is recommended that AC power cables be no longer than 30 m.
Connection
Crimped OT
terminal
Crimped OT
terminal
Crimped OT
terminal
NO TICE
Copyright © Huawei Technologies Co., Ltd.
Bolt
Torque
Specificatio
ns
M10
26N.m
M10
26N.m
M10
26N.m
3 Installation Guide
Remarks
Standard
configuration,
delivered with the
product
Standard
configuration,
delivered with the
product
Standard
configuration,
delivered with the
product
32

Advertisement

Table of Contents
loading

Table of Contents