NetCol8000-E220 Modular Indirect Evaporative
Cooling System
User Manual
Follow-up Procedure
After the equipment is hoisted and installed, verify the installation to ensure
normal use and smooth subsequent installation.
Table 3-7 Installation checklist
No.
1
2
3

3.4 (Optional) Steel Base Scenario

Context
Table 3-8 Hoisting Precautions
Stage
Before hoisting
During hoisting
Issue 06 (2020-08-19)
Check Item
Contact between
NetCol8000-Es and
concrete platforms
Bolts and nuts
Pre-fab. module doors
Precautions
Ensure that the crane and steel ropes provide the required
bearing capacity.
The doors of NetCol8000-Es to be hoisted are closed.
Ensure that the steel ropes are securely connected.
Ensure that the weather condition is good without wind
when NetCol8000-Es need to be hoisted outdoors.
Do not allow any unauthorized people to enter the
hazardous areas and never stand under the crane arm
during hoisting.
Ensure that the crane is properly located and avoid long-
distance hoisting.
Keep the device stable and horizontal during hoisting, and
ensure that the diagonal gradient of the NetCol8000-E is
within 5 degrees.
Copyright © Huawei Technologies Co., Ltd.
Check Method
Observe.
Partially tighten them
using a wrench.
All NetCol8000-E
doors can be
smoothly opened and
closed.
3 Installation Guide
Criteria
A NetCol8000-E is in
close contact with
and evenly supported
by the concrete
platforms.
Bolts and nuts are
tightened.
Open and close each
NetCol8000-E door
once.
36