Huawei NetCol8000-E220 User Manual page 121

Modular indirect evaporative cooling system
Hide thumbs Also See for NetCol8000-E220:
Table of Contents

Advertisement

NetCol8000-E220 Modular Indirect Evaporative
Cooling System
User Manual
Tapping No or Exit, submission timeout, and system exception all result in
commissioning failures. Choose Maint > Wizard Startup to enter the Wizard
Startup screen for new commissioning.
Procedure
Step 1 On the home screen, choose Maint > Wizard Startup, as shown in
Figure 4-30 Startup wizard
Step 2 Tap Yes. The checking before startup screen is displayed, as shown in
If the remaining refrigerant is not charged, tap No. Complete refrigerant charging,
and then perform the wizard commissioning.
Figure 4-31 Checking before startup
Step 3 Follow the onscreen instructions to complete the wizard startup.
Issue 06 (2020-08-19)
NO TICE
NO TE
● For the initial startup wizard, Last record is in gray, indicating that the operation is not
allowed.
● For the non-initial startup wizard, choose Last record and you can view the last startup
wizard report.
NO TICE
Copyright © Huawei Technologies Co., Ltd.
4 Power-on and Commissioning
Figure
Figure
4-30.
4-31.
112

Advertisement

Table of Contents
loading

Table of Contents