2. While supporting the valve mount, remove the 4
flange-head bolts (3/8 x 1 inch) and 4 flange locknuts
(3/8 inch) that secure the valve mount to the frame of
the machine
(Figure
Figure 45
1. Flange-head bolt (3/8 x 1
inch)
2. Valve mount
3. Remove the valve support, valves, and boom section
hoses from the machine
Note: Retain the 4 flange-head bolts, 4 flange nuts, 2
Phillips-head screws and 2 washers for installation
the Valve Mount to the Machine (page
need the agitation valve, boom-section valves, and hoses for
the left, center, and right boom sections.
45).
3. Frame (machine)
4. Flange locknut (3/8 inch)
(Figure
45).
9 Installing
23).You no longer
8
Assembling the Sprayer-Valve
Assembly to the Valve Mount
Parts needed for this procedure:
1
Sprayer-valve assembly
1
Cover—52 mm (2-1/16 inches)
1
Gasket—25 x 35 mm (1 x 1-3/8 inches)
1
Flange clamp—40 to 64 mm (1-9/16 to 2-1/2 inches)
1
Valve mount
5
Flange-head bolts (5/16 x 1 inch)
5
Flange locknuts (5/16 inch)
Assembling the Cover to the 90° Elbow
1. Align the gasket—25 x 35 mm (1 x 1-3/8 inches) and
cover—52 mm (2-1/16 inches) to the flange of the 90°
elbow
(Figure
46).
1. 90° elbow
2. Gasket—25 x 35 mm (1 x
1-3/8 inches)
2. Secure the gasket and cover to the elbow with the
flange clamp—40 to 64 mm (1-9/16 to 2-1/2 inches)
as shown in
Figure
21
Figure 46
3. Cover—52 mm (2-1/16
inches)
4. Flange clamp—40 to
64 mm (1-9/16 to 2-1/2
inches)
46.