Toro Multi Pro 5800-D Installation Instructions Manual page 15

Turf sprayer
Hide thumbs Also See for Multi Pro 5800-D:
Table of Contents

Advertisement

Figure 31
1. Retainer
2. 90° hose fitting
3. Drain hose
Removing the Agitation Nozzles and
Hoses
1. At the sprayer pump, remove the hose clamp that
secures the agitation supply hose to the barbed fitting
of the ball valve
(Figure
Figure 32
1. Hose (agitation supply)
2. Hose clamp
2. Remove the agitation supply hose from the barbed
fitting
(Figure
32).
3. At the side of the tank, remove the 4 retainers that
secure the agitation nozzles to the bulkhead fitting in
the wall of the tank
4. Hose clamp
5. Barbed fitting (drain valve)
32).
3. Barbed fitting (ball valve)
(Figure
33).
1. Bulkhead fitting
2. Agitation nozzle
4. Loosen all 4 nozzles from the bulkhead fittings.
5. Remove the nozzles and attached hoses from the
machine
(Figure
Note: Retain the 4 retainers for installation in
Installing the Agitation-Nozzle Assemble and Hoses
(page
26). You no longer need the hose clamp, agitation
nozzles, and the attached hoses.
15
Figure 33
3. Retainer
33).

Advertisement

Table of Contents
loading

This manual is also suitable for:

132-4276

Table of Contents