Figure 9-19 Battery position
Figure 9-20 Connecting battery cables
● Do not connect the red positive cable until power-on commissioning.
● Ensure that battery cables for the extinguishant control panel are connected to
correct polarities.
Step 4 Close the door of the fire control panel.
----End
9.4.2 Installing Standard Fire Extinguishing Devices
9.4.2.1 (Optional) Installing the Fire Extinguisher Cylinder
Prerequisites
●
●
Issue 07 (2022-12-15)
NO TICE
Pre-fab. modules have been installed.
The extinguishant in the fire extinguisher cylinder meets the requirement.